Model for Operational Reserve Adequacy

The MORA project consisted of developing a simulation tool based on the sequential Monte Carlo algorithm to assess the adequacy of the static and the operatinal reserve of interconnected generation systems. This project arose from a request from the Portuguese transmission system operator, REN, to meet the new challenges in the electricity system arising from the integration of a greater volume of variable renewable power and the progressive interconnection of European networks.

Details

Details

  • Acronym

    MORA
  • Start

    05th April 2016
  • Global Budget

    0,00 €
  • State

    Closed
  • Effective End

    31st December 2018
  • End

    31st December 2018
  • Responsible

Team