Cookies Policy
The website need some cookies and similar means to function. If you permit us, we will use those means to collect data on your visits for aggregated statistics to improve our service. Find out More
Accept Reject
  • Menu
Description

Acordo de Cooperação em P&D entre INESC P&D Brasil e INESCTEC para participação no projeto TECCON2

The goal of the project is to develop a polymeric insulator with 230 kV insulation class, equipped with optical fibre sensors for monitoring currents and temperatures. In addition, a supervisory system based on computational intelligence models for data retrieval and processing will be developed. Relevant information on the condition of power lines will be obtained by the sensors located at the tower, through a measurement unit, and sent via OPGW cables to the management and control centre. A feeding system will be designed to provide the necessary energy to the measurement unit.

Details

Details

  • Acronym

    TECCON2
  • Start

    01st January 2016
  • Global Budget

    0,00 €
  • State

    Closed
  • Effective End

    30th June 2020
  • End

    30th June 2020
  • Responsible

    Pedro Jorge
Team
001

Associated Centres

CAP

Centre

Applied Photonics