2023
Autores
Tavares, B; Pereira, J; Gouveia, C; Retorta, F; Mourão, RL; Louro, M;
Publicação
IET Conference Proceedings
Abstract
Taking advantage of the flexibility of Distributed Energy Resources (DER) can help improve distribution network efficiency, reliability and resilience. EUniversal project aims to facilitate the use of flexibility services and interlink active system management of distribution system operators with electricity markets. congestion management and voltage control have been identified has the most relevant needs, within different operation timeframes, namely: from day, weeks and years ahead. This paper considers long-term flexibility services to support maintenance actions, increasing the periods where is technically possible to perform maintenance actions maintaining security of operation. The methodology developed to schedule planned maintenance actions based on forecasted network profiles, maintenance costs, network reconfiguration capability and flexibility contracted in long-term flexible markets will be presented. © The Institution of Engineering and Technology 2023.
2023
Autores
Viegas, P; Cabral, D; Gonçalves, L; Pereira, J; Andrade, R; Azevedo, M; Simões, J; Gomes, M; Costa, C; Benedicto, P; Viana, J; Silva, P; Rodrigues, A; Bessa, R; Simões, M; Araújo, M;
Publicação
IET Conference Proceedings
Abstract
The increasing integration of renewable energy sources (RES) at different voltage levels of the distribution grid has led to technical challenges, namely voltage and congestion problems. Conversely, the integration of new Distributed Energy Resources (DER) provides the necessary flexibility to accommodate higher RES integration levels. This work describes the development of innovative functional modules, based on optimal power flow calculations and grid forecasting, dedicated to the predictive management of the distribution grid considering DER flexibility, which are integrated into a commercial SCADA/DMS solution. © The Institution of Engineering and Technology 2023.
The access to the final selection minute is only available to applicants.
Please check the confirmation e-mail of your application to obtain the access code.