Cookies
O website necessita de alguns cookies e outros recursos semelhantes para funcionar. Caso o permita, o INESC TEC irá utilizar cookies para recolher dados sobre as suas visitas, contribuindo, assim, para estatísticas agregadas que permitem melhorar o nosso serviço. Ver mais
Aceitar Rejeitar
  • Menu
Publicações

Publicações por Fernanda Resende

2011

Service restoration on distribution systems using Multi-MicroGrids

Autores
Resende, FO; Gil, NJ; Pecas Lopes, JAP;

Publicação
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER

Abstract
Large scale integration of distributed generation of both medium and low voltage (LV) networks can be achieved by exploiting the Multi-MicroGrid (MMG) concept, a new distribution system architecture comprising a hierarchical control system, which allows the coordination among distributed generation units and MicroGrids (MGs) and therefore the operation of such a system in islanded mode. After a general blackout the MMG capabilities can also be used to provide service restoration in distribution systems. A new procedure for MMGs black start is then addressed in this paper. A sequence of control actions is defined and evaluated through numerical simulations. Fully automation of the entire MMG black start procedure is discussed along the paper. The results obtained demonstrate the feasibility of the proposed sequence of control actions and highlight some accomplishments that should be considered in order to successfully restore the MMG service, ensuring system stability and power quality. Copyright (C) 2010 John Wiley & Sons, Ltd.

2005

Control strategies for MicroGrids emergency operation

Autores
Pecas Lopes, JA; Moreira, CL; Madureira, AG; Resende, FO; Wu, X; Jayawarna, N; Zhang, Y; Jenkins, N; Kanellos, F; Hatziargyriou, N;

Publicação
2005 International Conference on Future Power Systems (FPS)

Abstract
Under normal operating conditions, a MicroGrid (MG) is interconnected with the Medium Voltage (MV) network. However, planned or unplanned events like maintenance or faults in the MV network, respectively, may lead to MG islanding. In order to deal with islanded operation and even black start following a general blackout, an emergency operation mode must be envisaged. Two possible control strategies were investigated and are described in this paper in order to operate a MG under emergency mode. A sequence of actions for a well succeeded black start procedure, involving microgeneration units, has also been identified contributing for an increase in distribution network reliability.

  • 4
  • 4