2005

Reliability of distribution networks with microgrids

Autores
Costa, PM; Matos, MA;

Publicação
2005 IEEE Russia Power Tech, PowerTech

Abstract
The emergence of micro-generation as a technically sound alternative has lead, in recent times, to the concept of microgrid, a network of LV consumers and producers able to export electric energy in some circumstances and also to work in a isolated way in emergency situations. Research work about the organization of microgrids, control devices, functionalities and other technical and economic aspects is presently being carried out, in order to establish a consistent technical framework to support the concept. Among other aspects, the effect of microgrids in the reliability of the distribution network has been pointed out as an important advantage, due to the ability of isolated operation in emergency situations. In order to address this topic, the present paper identifies the situations where the existence of a microgrid may reduce the interruption rate and time and thus improve the reliability indices of the distribution network. The relevant expressions necessary to quantify the reliability are also presented. An illustrative example is included, where the global influence of the microgrid in reliability is commented.

2005

Long term marginal prices - Solving the revenue reconciliation problem of transmission providers

Autores
Braga, ASD; Saraiva, JT;

Publicação
15th Power Systems Computation Conference, PSCC 2005

Abstract
This paper describes a model to perform transmission expansion planning studies together with the computation of Long Term Marginal Prices along the planning horizon. The model includes four criteria and adopts a Simulated Annealing based algorithm to solve the problem. The algorithm also provides Long Term Marginal Prices reflecting both investment and operation costs, thus being able to conveniently address the Revenue Reconciliation Problem that would arise if short-term approaches were used. The paper includes a case study based on the 400/220/150 kV Portuguese transmission system to illustrate the application of the proposed algorithm and highlight its potential.

2005

A multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation

Autores
Braga, ASD; Saraiva, JT;

Publicação
IEEE TRANSACTIONS ON POWER SYSTEMS

Abstract
This paper presents a multicriteria formulation for multiyear dynamic transmission expansion planning problems. This formulation considers three criteria: investment costs, operation costs, and. the expected energy not supplied. The solution algorithm adopts an interactive decision-making approach that starts at a nondominated solution of the problem. This solution is identified transforming two of the three criteria in constraints specifying aspiration levels and using afterwards simulated annealing to deal with the integer nature of investment decisions. After obtaining this first solution, the decision maker can alter the aspiration levels and run the application again to obtain a new solution. Once an expansion plan is accepted, the algorithm computes long-term marginal costs, reflecting both investment and operation costs. These costs are more stable than short-term ones and inherently address the revenue reconciliation problem well known in short-term approaches. The developed algorithm is tested using a case study based on the Portuguese 400/220/150-kV transmission network.

2005

Dealing with uncertainties in long term transmission expansion planning problems

Autores
Braga, AS; Saraiva, JT;

Publicação
2005 IEEE Russia Power Tech, PowerTech

Abstract
Transmission expansion planning corresponds to a very relevant issue that should not be forgotten in the scope of the implementation of market mechanisms in the electricity sector. This paper describes a multicriteria model to perform transmission expansion planning exercises that combines probabilistic models to represent the reliability of system components with fuzzy models to incorporate the uncertainty on load evolution along the planning horizon. This formulation also outputs long-term marginal prices that can be used to compute the Marginal Based Remuneration. The paper includes a case study based on the Portuguese 400/220/150 kV transmission network.

2005

Development of a market approach to integrate microsources in LV distribution networks

Autores
Saraiva, JT; Sa, AR;

Publicação
2005 IEEE Russia Power Tech, PowerTech

Abstract
This paper describes the research under development regarding the integration of several types of micro-source in LV distribution networks. This research is financed through an EU R&D project and tackles several scientific and technological related problems in the fields of micro-source electrical modelling, power system LV operational impact analysis, monitoring and control, power quality and network reliability, protection coordination and personnel safety, communications, economical and electrical market driven procedures and definition of new interconnection standards. In particular, in this paper we describe an approach to schedule micro-source generation and to validate that dispatch from a technical point of view using a lineraized optimization problem. The paper includes results from a case study developed in a LV test network used in the scope of the referred project.

2005

Active / reactive dispatch in competitive environment

Autores
Gomes, MHR; Saraiva, JT;

Publicação
2005 IEEE Russia Power Tech, PowerTech

Abstract
Ancillary Services play an important role in power systems since they are crucial to ensure the security and quality of operation. However, this issue is sometimes forgotten and power systems tend to be analysed only from the point of view of electricity markets to schedule active power. In several countries, active and reactive dispatches were decoupled but in fact this causes several inefficiencies and technical difficulties since their schedules is not independent and the two of them determine the operation conditions of power systems. This paper describes an active / reactive dispatch model that retains the competitive aspects currently in force in power systems. It is based on an initial pool dispatch and on adjustment bids used to change generation or load values namely to accommodate losses or to curtail load if that is required to meet operation or technical constraints. This certainly contributes to clarify the roles of the Market and System Operators and to turn the decisions from the System Operator more robust and justifiable from a technical point of view.

  • 283