Cookies
O website necessita de alguns cookies e outros recursos semelhantes para funcionar. Caso o permita, o INESC TEC irá utilizar cookies para recolher dados sobre as suas visitas, contribuindo, assim, para estatísticas agregadas que permitem melhorar o nosso serviço. Ver mais
Aceitar Rejeitar
  • Menu
Publicações

Publicações por CPES

2003

A new online identification methodology for flux and parameters estimation of vector controlled induction motors

Autores
Leite, V; Araújo, R; Freitas, D;

Publicação
IEMDC 2003 - IEEE International Electric Machines and Drives Conference

Abstract
A new online identification methodology for estimation of the rotor flux components and the main electrical parameters of vector controlled induction motors is presented in this paper. The induction motor model is referred to the rotor reference frame for estimation of rotor flux and rotor parameters, and referred to the stator reference frame to estimate stator parameters. The stator parameters estimation is achieved by a prediction error method based on a model structure described by a linear regression that is independent of rotor speed and rotor parameters. The rotor flux components and rotor parameters are estimated by a reduced order extended Kalman filter, using a 4th-order state-space model structure where the state equation is described by matrices that are diagonal and independent of rotor speed as well as stator parameters. Both methods work in a boot-strap manner. © 2003 IEEE.

2003

Indirect parameter estimation of continuous-time systems using discrete time data

Autores
Araujo, RE; Leite, AV; Freitas, DS;

Publicação
IECON'03: THE 29TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOLS 1 - 3, PROCEEDINGS

Abstract
This paper addresses the problem of parameter estimation of continuous-time systems using samples of its input-output data. We propose a method based on the bilinear transformation to obtain an equivalent discrete-time model. Introducing a new, polynomial pre-filter it is possible to compute the physical parameters via inverse mapping between the discrete-time and the continuous-time models. A simulation example is given to illustrate the noise effects in the parameter estimation results. Using experimental results, we demonstrate the ability of the estimator to handle real measurement problems.

2003

Progresses on the design of a surveillance system to protect forests from fire

Autores
Moutinho, JN; Mesquita, FD; Martins, N; Araujo, RE;

Publicação
ETFA 2003: IEEE CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS

Abstract
This paper describes a surveillance system for forest environments and protected natural areas with capacity for detecting fires and other ecological crimes. This system uses a digital camera that is controlled remotely by a system operator. Using the software the operator may chose to zoom a special spot or even take measures to place a strategy to fight the lire right before it becomes uncontrollable. Since that this system has to operate in the middle of forests, aspects like effectiveness, robustness and reliability are crucial. To make the positioning of camera, the system uses a stepper motor to the vertical movement of the camera, and a DC motor to the horizontal movement. The system also captures information about the temperature, humidity, wind speed and direction. All the processing is realized by a PIC16f877 microcontroller.

2003

Decision-support tool for the establishment of contracts in the electricity market

Autores
Azevedo, F; Vale, ZA; Do Vale, AA;

Publicação
2003 IEEE Bologna PowerTech - Conference Proceedings

Abstract
The Pool, in many countries, was adopted for the participants of the electricity market to trade the electrical energy in a basis of each half-hour or one hour of the next day. However, like the traditional markets, the agents of electrical market are now exposed to the volatility of market price. In some countries, to face that problem and to turn the market more liquid, the derivatives markets - futures and options - were introduced to negotiate products with electrical energy as underlying active. In this context, there is a need of decision-support tools to assist those agents for the use of derivatives markets with the objective of practicing the hedge. In this paper, we present a decision model that supports producers to establish contracts with the objective to maximize the profit expected utility. © 2003 IEEE.

2003

Voltage wave quality in low voltage power systems

Autores
Baptista, JMR; Cordeiro, MR; Machado E Moura, A;

Publicação
Renewable Energy and Power Quality Journal

Abstract
This paper deals with some disturbances that reach the electric power systems. These problems originated some interest due to the changes of the electric loads characteristics, which were predominantly electromechanical and today are predominantly non-linear. This is due to the electronic systems involved. Results of some measurements performed in electric grid of the Oporto Engineering Faculty Campus and in the University of Vila Real (UTAD) are presented and some solutions that had been implemented for the related problems minimization are also described.

2003

A Goal Programming Model for Rescheduling of Generation Power in Deregulated Markets

Autores
Centeno E.; Vitoriano B.; Campos A.; Muñoz A.; Villar J.; Sánchez-Úbeda E.;

Publicação
Annals of Operations Research

Abstract
In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented.

  • 296
  • 318