Cookies
O website necessita de alguns cookies e outros recursos semelhantes para funcionar. Caso o permita, o INESC TEC irá utilizar cookies para recolher dados sobre as suas visitas, contribuindo, assim, para estatísticas agregadas que permitem melhorar o nosso serviço. Ver mais
Aceitar Rejeitar
  • Menu
Publicações

Publicações por Fernando Maciel Barbosa

2005

Evaluating voltage stability in a substation

Autores
Santos, JL; Barbosa, FPM;

Publicação
IEE Conference Publication

Abstract

2000

Power system state estimation - An overview

Autores
Ferreira, IM; Carvalho, JB; Barbosa, FM;

Publicação
Proceedings of the Universities Power Engineering Conference

Abstract
Today, the State Estimation is considered as the heart of nearly all modern network control centers. Among other factors, the technical developments in fast data communication network technology opens up the possibility of parallel and distributed implementations of the state estimation function. This paper provides an overview of the state of the art in Power Systems State Estimation.

1997

Transient stability analysis of an electric power system using a combined Monte Carlo-extended equal area formulation

Autores
Ferreira, CMM; Pinto, JAD; Barbosa, FPM;

Publicação
Proceedings of the Universities Power Engineering Conference

Abstract
In this paper a combined Monte Carlo-extended equal area formulation for the transient security assessment of a multimachine power system is proposed. This approach evaluates a probabilistic measure of the transient stability, instead of just a particular response to a specified disturbance. Due to the large number of calculations required, the application of the extended equal area criteria reduces drastically the computing time, since it allows to evaluate the critical clearing times and the stability margins without solving numerically the differential motion equations. The probabilistic software package TRANsySTEM, developed by the authors to study the transient security of a multimachine system, is applied to a test network. During the simulation time, the occurrence of disturbances and the subsequent protective actions are assumed as a stochastic process. Finally, the obtained results are discussed and some conclusions that provide a valuable contribution to the understanding of the system dynamics are pointed out.

2009

Risk assessment for operations in the portuguese transmission system the key issues for the probability of contingencies

Autores
De Almeida, SAB; Pestana, R; Maciel Barbosa, FP;

Publicação
CIGRE International Symposium Guilin 2009: Operation and Development of Power System in the New Context

Abstract
The increasing competitiveness of the power systems' environment has created new challenges to the power system security assessment, demanding the development of new methodologies. Important aspects of this evolution are the unbundling of generation, transmission and distribution, caused by regulatory changes and creating a more competitive environment, the increased environmental concerns making it more difficult to build new assets, and the strong incentives to the generation from renewable energy sources. These factors contribute to the increasing stress on operating conditions and, consequently, cause more vulnerable networks. In recent years, the daily routine of transmission system operators has become more complex. The interconnected network is no longer just for mutual support; nowadays it has become the base platform for trading electricity allowing the shifting of increasing volumes of power across the system. Despite all the benefits that doubtless are many, from the operations perspective, the free electricity market presents more unpredictable and less stable power flows, a market-dependent generation pattern, also more unpredictable and less controllable. In addition to the latter, the significant amount of generation from renewable energy sources also contributes to place the system closer to its security limits. Therefore, and despite the bigger complexity and increased quality of service requirements, the energy supply and the optimization of resources remain a permanent goal, fulfilling all the security principles used for system operation. Incidents are naturally unpredictable and after the large disturbances which occurred in recent years (such as the blackouts on 9th May of 2000 in Portugal, on August 14th 2003 in the United States of America, on September 28th 2003 in Italy and in the European UCTE Network on November 4th 2006), the awareness of the risk of unpredictable disturbances has increased, and it has become essential for the decision-making process to have security indices that allow the operator to react in advance and to be aware of inherent risks, preventing harmful situations. The use of methodologies that take advantage of the actual real-time conditions in combination with past knowledge is extremely interesting in the system operation environment, because it gives a more accurate overview to the control room operators. Since long, the deterministic security assessment has been used to guarantee a high level security in system operations of Transmission Systems, being known as N-1 criterion. It tends to provide a conservative security region for protecting the system against severe contingencies. In the deterministic approach only the consequences of contingencies are assessed, but it does not consider likelihood, or better it does consider likelihood equal to one for all contingencies, therefore it cannot address increased or decreased uncertainty in operating conditions, such as adverse meteorological conditions or risk of forest fires. The advantages of probabilistic methods in comparison with deterministic ones are further developed in [1, 2]. Hence, the probabilistic assessment has become an important topic for researchers and engineers, because by combining consequences and probability it is possible to evaluate risk of contingencies, as in (1): Riskcontingency i = probabilitycontingency i × severitycontingencyi (1) Through the historical data, it is possible to affirm that most incidents originate from overhead lines (OHL). From 2001 until the end of 2008, OHL represent on average 91% of the incidents with origin in the Portuguese transmission system. Overhead lines, due to their dispersion over a wide geographic area and because of the many different ground characteristics where they are deployed, are more exposed to the action of external factors which cause most of the grid incidents. An accurate characterization of each incident's cause, an analysis of their occurrence and of the intrinsic characteristics of the Portuguese territory is presented in reference [3], including geographical and meteorological data, which are a crucial part of the inputs for the risk assessment methodology. This paper aims to describe the key issues of the calculation of the circuit-part of overhead lines contingencies probability, as part of the risk assessment methodology (figure 1), which is being developed and has as main purpose to support control room operators in their continuous task.

2010

Risk assessment methodology for operations applied to the Portuguese transmission system - The probabilistic model

Autores
De Almeida, SAB; Pestana, R; Maciel Barbosa, FP;

Publicação
43rd International Conference on Large High Voltage Electric Systems 2010, CIGRE 2010

Abstract
Nowadays most of the transmission systems' operating conditions are more stressed due to the introduction of a competitive environment in the power system industry and the regulatory changes causing the unbundling of generation, transmission and distribution, the environmental concerns, which limit the construction of new transmission lines and generation capacity, and the strong incentives to the generation through renewable energy sources. The use of methodologies that take advantage of the actual real-time conditions in combination with past knowledge is extremely interesting in the system operation's environment, because it gives a more accurate overview to the control room operators allowing them to prevent harmful situations. Obviously, this type of methodologies has received even more interest after the large disturbances which occurred in recent years, because they increase the awareness about the risk of unpredictable disturbances. Recent international data show that the frequency of large blackouts has increased and also that simple initiating faults can have very severe consequences. References [1-4] present a few examples of severe disturbances, which occurred in the recent past. Despite all the efforts being done regarding supervisory practices, operation strategies and protection and control systems' improvements, it is technically and economically impossible to eradicate major disturbances and blackouts. They will be a permanent threat to the electrical power systems, making incident analysis a crucial activity. The risk assessment methodology that is being developed is composed of two parts: probability of occurrence and severity for all contingencies under analysis. This paper aims to present the complete probabilistic model used to calculate the probability of occurrence of contingencies, including overhead lines, transformers and busbars. N-2 common cause contingencies are also considered for faults caused by lightning and forest fires.

2008

A practical approach to lighting design course in an electrical engineering programme

Autores
Travassos Valdez, MM; Faustino Agreira, CI; Machado Ferreira, C; Maciel Barbosa, FP;

Publicação
International Journal of Emerging Technologies in Learning

Abstract
Technology has allowed new insights and creativity into the learning and teaching process and also enables to try out in a much more flexible, dynamic way other learning experiences. This constitutes in itself a more engaging role for teachers as well as students helping them to explore and create new areas, opening up, at the same time, new perspectives into the process and maximizing the availability and use of the current tools which the same technology provides. The facilitation in the investigation work development of projects renders the learning and teaching activities really appealing, allowing at the same time levels of effectiveness in this extremely modern and global era. This study integrates technology in the learning process and evaluation of its various outcomes. This case study describes the experience of two teachers with their class along a semester using computer aided technology for instruction and assessment. The task involved the lighting design of monuments with the purpose of attracting the on lookers' attention, enhancing the beauty and attributes of the façade of monuments or buildings considered relevant or of public interest. An approach of reinforcement learning applied to the historical monuments light configurations will be described.

  • 19
  • 28